Device for treatment of debris flow using gabion mesh
Device for treatment of debris flow using gabion mesh, is composed of multilayer cage group, each
group of the cage group is composed of no less than interval net piece two piece consists of not less
than three of the net cage, the cage filled with rocks, department is bound with a doublecombination
wire binding in two two cage group, the adjacent upper and lower cage between groups. Through the
double combination wire bundling.
Since the implementation of the above technical scheme, the utility model has the advantages of
simple requirement for material, convenient, the acquisition of a large number of filling materials in
the construction site can be. The erection of the required artificial, mechanical less, ordinary staff to
the construction.
simple requirement for material, convenient, the acquisition of a large number of filling materials in
the construction site can be. The erection of the required artificial, mechanical less, ordinary staff to
the construction.
The specific implementation way:
The utility model facilities from the following examples of restrictions, can determine the specific implementation way according to the technical scheme of the utility model and the actual situation.
Device for treatment of debris flow using gabion mesh is composed of multilayer cage group, each
group of the cage group is composed of no less than interval net piece two piece 4 points for not less
than three of the net cage in cage 2, 2 is filled with rock, rock is not best hard rock weathering.In two
two the cage group combination part 3 is bound with a double combination wire, wire materialwith
the same material combined cage. Between the adjacent upper and lower cage group bydouble
combination wire bundling, strapping at intervals of 15 20cm, located beneath the surfacemesh
cage group box line or interval 4. In front of the rock fill in cage group, inner and outer sidebinding
surface 1, such as steel or wood, such as rock fill construction after the removal, it can guarantee
the body neat and smooth.
group of the cage group is composed of no less than interval net piece two piece 4 points for not less
than three of the net cage in cage 2, 2 is filled with rock, rock is not best hard rock weathering.In two
two the cage group combination part 3 is bound with a double combination wire, wire materialwith
the same material combined cage. Between the adjacent upper and lower cage group bydouble
combination wire bundling, strapping at intervals of 15 20cm, located beneath the surfacemesh
cage group box line or interval 4. In front of the rock fill in cage group, inner and outer sidebinding
surface 1, such as steel or wood, such as rock fill construction after the removal, it can guarantee
the body neat and smooth.